Concrete Volume Calculator

Add every slab, footing, wall, post hole or step in your pour and get cubic yards, bag counts and truck loads, with the waste allowance already in.

Units

Pieces in this pour

    Add a piece

    Split odd outlines into these shapes. Tick "Subtract" on a piece for cutouts such as planters or drains.

    Waste allowance and weight

    NRMCA's ordering guide suggests 4% to 10% over the plan volume. Use the low end for tight forms on a screeded base, the high end for uneven subgrade or hand-dug trenches.

    Normal-weight concrete runs 140 to 150 lb per cubic foot. Use your mix design's figure for lightweight or heavyweight concrete.

    Concrete to order

    1.63cubic yards

    Includes 10% extra. Round up to 1.75 cu yd when you order.

    Cubic feet
    44.0
    Cubic meters
    1.25
    Before waste
    1.48 yd³

    Bagged concrete

    Bags needed by bag size, with the total weight to carry
    BagYieldBagsWeight

    Yields from Quikrete Concrete Mix 1101. * The 90 lb bag is sold only in some regions. The bag label wins over this table, especially for fast-setting and high-strength mixes.

    Ready-mix trucks

    Mixer trucks carry 8 to 12 cubic yards. Each plant sets its own short load line (Cemstone uses 6.25 cu yd, Duininck 4), so use the figure from your quote.

    Weight

    Compare bags and ready-mix cost

    Enter prices from your local store and your ready-mix quote to compare the two routes.

    How to use the concrete volume calculator

    This concrete volume calculator adds up every piece of a pour and turns the total into cubic yards, cubic meters, bag counts, truck loads and weight, with your waste allowance built in.

    1. Choose feet and inches or meters and centimeters.
    2. Fill in the first piece, then add shapes until the whole pour is covered. Use Qty for repeats, such as ten identical post holes.
    3. Tick Subtract on any cutout.
    4. Set the waste allowance, then read the order quantity, bags, trucks and weight in the results panel.

    For a sloped slab, fill in the deep end and the tool uses the average depth. For post holes, pick the post shape so its volume comes out of the hole.

    The concrete volume formula

    Concrete volume comes down to one formula: length x width x thickness in feet, divided by 27. The answer is in cubic yards (or cubic meters after a conversion), and it goes straight onto a ready-mix order or gets turned into a bag count for whichever size you buy, from 40 lb up to 80 lb.

    Thickness is the only input a building code puts a number on. The International Residential Code requires slab-on-ground floors to be at least 3.5 inches thick (2018 and 2024 editions), but 4 inches is what most projects actually use. Typing 4 instead of 3.5 adds 14% more concrete before you add any waste allowance.

    How do you calculate concrete volume for a slab?

    Start by multiplying length, width, and thickness, all in feet. That gives cubic feet. Divide by 27 for cubic yards, since a cubic yard is 27 cubic feet (NCDOT Concrete Mix Design Manual, 2016). Ready-mix is sold by volume in cubic yards or cubic meters, according to NRMCA.

    Every calculator runs this same arithmetic. What it really saves you from is the unit conversion, and that's where most bad orders start.

    Take a 10 ft by 12 ft patio, 4 inches thick.

    1. Measure length, width, and thickness: 10 ft, 12 ft, 4 in.
    2. Convert thickness to feet: 4 / 12 = 0.333 ft.
    3. Multiply: 10 x 12 x 0.333 = 40 cubic feet.
    4. Divide by 27: 40 / 27 = 1.48 cubic yards.
    5. Add the allowance (10% here): 1.48 x 1.10 = 1.63 cubic yards. Round up when you order.

    Skip step 2 and the answer is off by a factor of 12. Typing 10 x 12 x 4 gives 480, not 40.

    The same method covers a house slab foundation. When the footprint isn't a clean rectangle, split it into rectangles and add them up.

    Which slab thickness to enter

    IRC section R506.1 sets a minimum of 3.5 inches for slab-on-ground floors, and 4 inches is the practical standard on most projects.

    Enter 4 unless the plans say otherwise. The plans always win over a default.

    Driveways and garage floors carry heavier loads, which means thickness comes from the plans or an engineer. Expansive soil is a different problem. R506.1 points to section R403.1.8 for it, so read that before settling on 4 inches, and model thickened slab edges as separate footing-style pieces.

    Converting cubic feet to cubic yards and cubic meters

    Divide cubic feet by 27 to get cubic yards (40 cubic feet = 1.48 cubic yards).

    Going from cubic yards to cubic meters means multiplying by 0.7646, so 1.48 cubic yards = 1.13 cubic meters. The reverse, cubic meters to cubic yards, uses 1.308.

    If your inputs are metric, convert centimeters and millimeters to meters before you multiply anything.

    The 0.7646 factor is 0.9144 cubed, since the international yard is defined as exactly 0.9144 meters. Run the same patio in metric (3.048 m x 3.658 m x 0.1016 m) and you land on 1.13 cubic meters.

    Concrete volume formulas for footings, walls, columns, stairs, and curbs

    Footings, walls, and curbs work like a slab: length x width x depth. Round columns, post holes, and stairs don't, so they get their own formulas.

    ShapeFormulaMeasureCommon slip
    Footinglength x width x thicknessrun, width, depthCorners counted twice
    Walllength x height x thicknesslength, height, wall thicknessOpenings left in
    Round column or post holepi x radius squared x heightdiameter, heightDiameter used as radius
    Stairsstacked steps (see below)width, rise, run, step countLanding forgotten
    Curbcross-section area x lengthprofile in square feet, lengthGutter lip left out

    The IRC sets footings at no less than 12 inches wide and 6 inches deep (section R403.1.1), and the tables in R403.1 raise the width with the load and soil. Take real dimensions from the plans, then run the numbers.

    A 100 ft footing run at the 12 in x 6 in minimum works out to 100 x 1 x 0.5 = 50 cubic feet, or 1.85 cubic yards.

    Walls go the same way. One that is 20 ft long, 4 ft tall, and 8 in thick comes to 20 x 4 x 0.667 = 53.3 cubic feet, or 1.98 cubic yards.

    Round columns and post holes

    Use pi (3.1416) x radius squared x height, and halve the diameter first. Feeding the diameter in as the radius is the classic mistake here.

    Say you're filling a 12 inch round form (Sonotube is the common brand) that stands 4 ft tall. That's 3.1416 x 0.5 x 0.5 x 4 = 3.14 cubic feet, about 0.12 cubic yards.

    Post holes need one more step. A 3.5 inch square post (a nominal 4x4) in a 10 inch hole 3 ft deep displaces about 0.26 of the 1.64 cubic feet, roughly 16%, so subtract the post if it runs the full depth.

    Stairs and curbs

    Solid stairs are a stack of rectangles. The formula is width x run x rise x n(n + 1) / 2, where n is the number of steps.

    Take four steps with a 7 in rise, an 11 in run, and a 4 ft width. That gives 4 x 0.917 x 0.583 x 10 = 21.4 cubic feet, or 0.79 cubic yards. Calculate a landing as a separate slab and add it.

    Curbs are cross-section area x length. A 6 in x 12 in profile is 0.5 square feet, so 50 ft of curb is 25 cubic feet, or 0.93 cubic yards.

    Irregular and sloped pours

    Break the shape into pieces you already have formulas for, then add the volumes. Most outlines reduce to rectangles and triangles (0.5 x base x height x thickness), with a circle thrown in now and then. Subtract cutouts such as planters or drains.

    A slope that changes evenly can use the average of the shallow and deep depths. One that changes unevenly needs depth readings at several points, because a single average hides the low spots, which is where the extra concrete goes.

    How much extra concrete should you order?

    Order 4% to 10% more than the volume calculated from the plan dimensions. That range comes from the NRMCA ordering guide (CIP 31), which ties the extra to contingencies.

    The common shortcut skips the range and applies one flat factor, usually 5% or 10%.

    A flat percentage hides the bigger risk, which is depth. Volume scales directly with thickness, so a small average overshoot eats the whole allowance.

    A 4 in slab poured at a 4.5 in average uses 12.5% more concrete. The same half inch on a 6 in slab poured at 6.5 in is 8.3% more. And a 4 in slab that averages 4.25 in only runs 6.25% over.

    In that first case a 10% allowance is gone before any spillage. Measure the subgrade at several points and average the depth before you order.

    Go to the low end of the range for tight forms on a screeded base. Uneven subgrade, hand-dug trenches, or forms that can flex push you toward the high end.

    Bigger is not safer, though. The same NRMCA guide advises against ordering excess concrete or small clean-up loads.

    On a full house, each pour carries its own allowance, so a construction takeoff lists slab, footings, and walls separately instead of padding one grand total.

    Round up after you add the allowance, never before.

    How many bags of concrete equal a cubic yard?

    A cubic yard takes 45 bags of 80 lb mix. Switch to 60 lb bags and it's 60, and the 40 lb size needs a full 90. Each count is 27 cubic feet divided by the bag's yield.

    Quikrete's Concrete Mix 1101 data sheet lists yields of about 0.30 cubic feet for a 40 lb bag, 0.375 for 50 lb, 0.45 for 60 lb, 0.60 for 80 lb, and 0.675 for a 90 lb bag. The bags-per-yard and coverage columns below are derived from those yields.

    Bag sizeYield (cu ft)Bags per cu ydArea at 4 in (sq ft)
    40 lb0.30900.9
    50 lb0.375721.1
    60 lb0.45601.35
    80 lb0.60451.8
    90 lb (regional)0.675402.0

    Divide cubic feet by the yield and round up. The 10 x 12 ft patio at 4 inches with 10% added is 44 cubic feet, or 74 bags of 80 lb mix.

    The table has limits, and they're worth knowing before you buy anything.

    The yield assumes the data sheet's mixing water, about 6 pints per 80 lb bag to start, with a final range of 6 to 9 pints. Mix 1101 is designed for pours 2 inches thick or more, so thin toppings need a different product with its own yield. The bag label overrides any table, and that goes double for fast-setting and high-strength mixes, countertop mixes included, since they print their own yield.

    The 80 lb bag halves the number you cut and carry compared with the 40 lb bag. Slabs call for the 80 lb size, while post holes and small repairs are fine with lighter bags.

    How many cubic yards does a ready-mix truck carry, and when is a short load charged?

    A mixer truck carries 8 to 12 cubic yards, and a short load fee applies when the order falls under the supplier's own minimum. NRMCA sets no minimum order, so the threshold is each plant's call.

    NRMCA puts truck mixer capacity at 8 to 12 cubic yards (5 to 9 cubic meters).

    On the pricing side, a part load charge applies to loads of 6.25 cubic yards or less (Cemstone 2026 dispatch guidelines). Unloading slower than 7 minutes per cubic yard adds $200 per hour (Cemstone 2026).

    Suppliers name the short load fee differently, and Cemstone calls it a part load charge. Its guidelines publish no dollar amount for it. Duininck's 2026 customer handbook does: orders of 4 cubic yards or less pay a small load fee of $175 up to 2 yards and $150 from 2 to 4 yards, and other minimum load requirements are disclosed at order.

    The quote is the real number.

    Run the 1.63 cubic yard patio through Cemstone's rule and it sits far below 6.25, so the charge applies. A patio-sized pour is a short load almost by definition.

    Trucks needed is volume divided by load size, rounded up. A 25 cubic yard pour on 10 yard trucks is three loads, and the third carries only 5 yards, which is the one a part load rule hits.

    Bagged concrete or ready-mix: which fits your volume?

    Bags win on small pours, and ready-mix wins once the bag count turns into a labor problem. The table shows where each route changes.

    FactorBagged concreteReady-mix
    Fits bestPost holes, repairs, small padsSlabs, footings, driveways
    LaborYou haul, open, and mix every bagTruck mixes, crew places and finishes
    Minimum orderNoneSet by the supplier, short load fee below it
    PaceSet by your mixerSet by the truck's discharge clock

    One cubic yard of 80 lb mix is 3,600 pounds of bags (45 x 80). Two yards is 7,200 pounds, and every bag still has to be mixed.

    Cost guides place the break-even at different yardages. The spread tracks supplier policy, not the method, because a part load charge or a delivery fee swings the per-yard cost of a small order sharply.

    Price both routes the way you'd price any line in an estimate of construction costs. On the bag side that's bag count times your local bag price. On the ready-mix side it's cubic yards times the supplier's price, plus the short load fee and delivery. The cost comparison in the calculator does exactly that once you enter your prices.

    Ready-mix also wins any time a pour can't be placed and finished in one continuous run by hand, even when the bag arithmetic looks cheaper. A stall between batches leaves a cold joint in the slab.

    How much does a cubic yard of concrete weigh?

    Normal-weight concrete runs 140 to 150 pounds per cubic foot, according to the Iowa DOT materials manual. Multiply by 27 and a cubic yard weighs 3,780 to 4,050 pounds.

    Work backward from a bag, though, and you get about 133 pounds per cubic foot.

    The two figures disagree because they weigh different things. The 133 comes from dividing an 80 lb bag by its 0.60 cubic foot yield, which counts the dry mix only. Add the mixing water and you're back inside the DOT range: Quikrete's data sheet lists the mix at about 140 pounds per cubic foot.

    Truck loads are the obvious place the number matters. A 10 yard load is about 40,500 pounds of concrete at 150 pounds per cubic foot, before the truck itself.

    For subgrade and framing, a 4 inch slab adds 50 pounds per square foot (150 x 4/12), and a 6 inch slab adds 75. When you're planning how much you can physically lift, use the dry bag weight, not the placed weight.

    Lightweight and heavyweight mixes fall outside the normal range, so use the mix design's own density for those.

    Where a concrete volume calculator gives the wrong number

    Thickness and subgrade variation

    ACI 117, as summarized by the Concrete Foundations Association, allows ±3/4 inch on the fine grade of the soil below a slab and lets average slab thickness run 3/8 inch under spec, with individual samples 3/4 inch under.

    The bottom of the slab follows the subgrade, so the concrete you order has to fill whatever depth the soil leaves. A subgrade 3/4 inch low across a 4 inch slab adds 18.75% (0.75/4), well past a normal allowance.

    1. Set a string line at the planned top of slab.
    2. Measure down to the subgrade on a grid every few feet, corners and center included.
    3. Average the readings.
    4. Use that average as the thickness in the formula.

    Measuring only the corners misses the dips in the middle, which is where the extra concrete goes.

    Input slips and rounding

    Mix up diameter and radius and a round column comes out four times too large.

    Mixed units are worse in a quieter way. A width in feet times a length in meters returns a number that means nothing, and a plain formula won't warn you. That's why this calculator keeps every field on one unit system at a time.

    Round bag counts down and the pour stalls on the last batch. When the quantity is miscalculated and the order comes up short, the balance load rides the next available truck, and that additional truck brings extra load charges (Cemstone 2026).

    Round up at the end, and check every unit before you multiply.

    Time limits on delivered concrete

    A correct volume still fails if the pour runs past the time limit.

    The 2020 edition of ASTM C94/C94M was the last to carry a fixed 90-minute discharge limit. The 2021 revision (C94/C94M-21) dropped it: the purchaser may state a time limit when ordering, the producer sets one if the purchaser doesn't, and the limit goes on the delivery ticket (NRMCA). C94 has been revised many times since 2021, so check the edition your supplier works to.

    At 7 minutes per yard, a 10 yard load takes 70 minutes to unload before the hourly charge starts. If the crew can't place and finish a load inside the ticket's limit, order smaller loads spaced apart and accept the short load fee.

    Concrete Volume Calculator FAQ

    How many square feet does one cubic yard of concrete cover?

    One cubic yard covers 81 square feet at 4 inches thick. Divide 27 cubic feet by the thickness in feet and you get 54 square feet at 6 inches, and about 93 at 3.5 inches.

    How many bags of concrete does a fence post need?

    A 4x4 post in a 12 inch hole 2 feet deep needs about 1.4 cubic feet of concrete, which is 3 bags of 80 lb mix.

    The post displaces 0.17 cubic feet of the 1.57 cubic foot hole, so subtract it before dividing by the bag yield.

    How much does a cubic yard of concrete cost?

    Ready-mix is priced per cubic yard by the supplier, so a written quote is the only reliable figure. It moves with mix strength and delivery distance, and the short load fee can swing it too.

    Cemstone sets a 3 cubic yard minimum on mixes of 6000 psi or higher, colored concrete, self-consolidating and high-early-strength mixes, and mixes with specialty admixtures (2026 dispatch guidelines).

    Do rebar and wire mesh reduce the concrete needed?

    No. A grid of #4 rebar at 12 inches on center displaces about 0.8% of a 4 inch slab, which sits well inside the waste allowance.

    Calculators skip reinforcing steel for that reason.

    Does concrete shrink after the pour, so I can order less?

    No. Ready-mix is sold by volume in its freshly mixed, unhardened state, according to NRMCA, so the form volume is the order.

    Shrinkage during curing is not a deduction.

    What the supplier needs after the volume is final

    A calculator result only becomes an order once it travels with a mix specification and a delivery plan.

    Lead with cubic yards, allowance included, because volume decides which minimums, part load rules, and truck counts apply. Strength and mix type come next, then the delivery window and truck access.

    Padding has a ceiling. Cemstone charges a $300 disposal fee when 2 or more yards of concrete are returned (2026), so a 10% allowance stays under that 2 yard line on any order below 20 cubic yards.